PROJECTS
FibreconX Macquarie Park
Mikcomm were engaged to complete a complex network construction through Macquarie Park NSW to ensure critical services were able to be commissioned for very large companies, connecting critical data centres.
Mikcomm had significant challenges to complete the activities such as under boring Epping Road, difficult landowners, fighting the worst rain in 100 years, constructing intricate 4 x 100mm ducts in extreme congestion and working through a global pandemic.
Although everything was thrown at Mikcomm through this project we completed 4km of intricate pit and pipe with zero defects at walkover, setting the benchmark for all other contractors.
This is a great place to add a tagline.
KOODIDERI RAIL
We have recently completed the Koodaideri Rail Network in the harsh conditions of the West Australian Pilbara.
We completed of 60 joints and fully terminated, tested and commissioned this network to world class standards including CD and PMD testing for the DWDM cores.
We developed custom workbook and supporting documentation to detail the results in a concise yet easy to read format.
OPTUS TUNCURRY
This is a great place to add a tagline.
15km of turnkey construction and installation, including:
-
60% of directional drilling and 40% trenching through a variety of difficult ground conditions
-
8 joints
-
Complex traffic management
-
Extensive and thorough testing and commissioning
OPTUS PALM BEACH
5G Microcell site
-
1500m of construction through the prestige area of palm beach
-
4.2km of cable hauling
-
2.5km of Telstra DCAF and breakouts
-
4 x 5G microcell sites
-
6 Fibre optic joints
-
Live network cutover and interconnection back to the hub site
-
Full testing and commissioning
ROY HILL MINE
This is a great place to add a tagline.
380km of fibre splicing and commissioning, including:
-
250 fibre optic joints
-
60 communication cabinets
-
Internal fibre network design and construct in operations centres at mine and port loops
-
Chromatic Dispersion and Polarisation Mode Dispersion Testing on DWDM links
OPTUS 312 CBD TO LOCKRIDGE LINK
Full turn key civil construction over 15km, including:
-
Repair and upgrade of existing networks sections
-
Interconnections with other carriers
-
Installation of cabinet in exchange and satellite station
-
Termination of exchange fibres
-
Bulk splicing of external 312 joints and full test and commissioning
OPTUS MT WHITE AND CALGA
This is a great place to add a tagline.
New mobile sites :
-
4.1km of construction
-
5km of cable hauling
-
8 splice enclosures
-
Full rock HDD
-
Redesign works to accommodate route change proposals due to environmental and community issues
OPTUS M4 RELOCATION
Relocation project due to the widening of the Northern Road and bridge drop in Penrith M4, including:
-
Design to find best location
-
Full service and asset location using NDD
-
3.5km of full turnkey installation
-
1.7km of new construction